Silage Clamp for Dyson Farming AD Facility

Precast T-walls and Earth Bank Panels supplied for a fast, compliant clamp installation in Lincolnshire.

Precast Walling for Mixed-Crop AD Feedstock Storage: Project Overview

Dyson Farming required a new clamp system for their anaerobic digestion plant in Nocton, Lincolnshire. The site needed a durable and compliant solution for storing various crop types. We worked directly with the Dyson team to design and supply a combined retaining wall system that was quick to install and easy to adapt.

The solution included 3m-high AGRI T-walls for a central dividing wall and sloped Earth Bank Panels to form the outer clamp boundaries. We installed the central wall in a single day, while the Earth Bank system was completed by the client’s own contractors.

Client – Dyson Farming

Project – Nocton AD Plant

Location – Nocton, Lincolnshire

Products – AGRI-T & Silage Clamp Panels

Wall Height – 3m

Wall Length – 290m (total)

Installation Time – AGRI-T 1 day

Installation Team – CBS/Dyson

Groundworks – Compacted sub-base and sand-cement/concrete blinding layer

Fixing Method – no fixing required

Compliance – SSAFO & Environment Agency design standards

Earth bank silage clamp panels for an biogas project
Earth Bank Retaining Walls For Silage Storage

Benefits of CBS Precast AGRI Walls for Silage Clamps

Agri-T retaining wall render
Icon for fast installation of precast retaining walls

Fast Installation

90m of walling completed in 1 day

precast retaining wall corner units icon

High Surcharge Capacity

15 kN/m² for safe silage compaction

Icon for groove to groove conection on retaining walls

SSAFO & EA compliant

Sealed joints for environmental protection

Icon for Agri-T wall

Large-format units

Fewer joints for faster build and better performance

Icon showing health and safety for precast retaining wall construction

Minimal groundworks

Earth Bank Panels placed on existing graded banks

The high-quality precast products from CBS were supplied and installed very quickly. As we will be storing a variety of crops, a central dividing wall was built using their Agri T-walls, which has definitely improved how we manage our AD feedstock.

Paul Carrott – Dyson Farming

Installation Timeline: One Day for T-Walls. Clamp Ready to Use.

Our team supplied and installed the 3m high AGRI T-walls using a crane, completing the central wall section in just one working day. The Earth Bank Panels were installed by the client’s in-house team, we also provided all accessories required – including seating channels, tie bars, mastic, and sealant.

The full clamp layout now supports multiple feedstocks while meeting all environmental and structural requirements.

Large Silage Clamp on Biogas Site For Dyson Farming

Why AGRI Walls Were the Ideal Solution

The team at Dyson needed a system that could divide the clamp into separate bays while maximising silage capacity and maintaining compliance. Our AGRI T-walls were chosen for the central dividing wall, providing strength and quick installation with minimal joints. To minimise groundwork and reuse the existing landscape, Earth Bank Panels were used for the outer walls.

This combination reduced labour and installation time while offering a modular, high-performance clamp layout that can support heavy equipment and diverse feedstock handling.

The Company We Keep

Learn More About Silage Clamp Wall Systems

Explore AD & Biogas Sector Projects

CE Mark Logo
Benor Logo
Boxed KOMO Logo
Scroll to Top